Reviewing to start on Work product drafts
Early testing is better for the project in dev and in cost savings.
Each dev level has one testing level
Component integration testing- structural, white box,
Impact analysis is used when deciding if a fix is worthwhile.
Functional testing can be performed at any level (4 levels- unit, integration, system integration and acceptance)
ISTQB foundation does not talk about the non-functional as it’s not in scope.
Confirmation testing (retest after the fix has been made) to make sure the issue is not reproduced!
Regression testing is no other parts are impacted by the fix provided in line with the previous statement above (confirmation testing)
impact analysis – fixing the maintenance system is worthwhile.